Before construction can start, most homes and small commercial buildings need a building permit, and that application begins with a drawing set. Requirements differ between local authorities, but most ask for the same core drawings. Knowing what they are helps you plan your budget, timeline and design decisions.
The core drawings
- Site plan: property lines, setbacks, the building footprint, driveways, utilities and drainage.
- Floor plans: every level, fully dimensioned, with room names, doors, windows and key notes.
- Exterior elevations: each side of the building with heights, roof slopes and exterior materials.
- Building sections: cuts through the building that show floor-to-floor heights, wall and roof assemblies.
- Roof plan: roof shapes, slopes and drainage.
- Details and schedules: wall sections, typical construction details and door and window schedules.
Drawings that may be required
Depending on your project and location, your local authority may also ask for structural drawings and calculations, energy compliance information, or mechanical, electrical and plumbing layouts. Some of these must be prepared or stamped by a licensed professional in your jurisdiction, so check early.
How to avoid review delays
- Download your local authority’s submission checklist before drafting starts.
- Keep dimensions, room names and notes consistent across every sheet.
- Answer plan review comments quickly and clearly, revising only what was asked.
How we help
Arch N Civil prepares complete, consistent drawing sets in Revit and AutoCAD from your sketches, existing plans or our own design, and updates them for review comments. Approval decisions rest with your local authority, and where stamps are required we coordinate with your licensed professional.
See our Permit Drawing Set service, or request a project proposal.




